01
Risk assessment
Every job starts with a written assessment for that specific site: the structure, the anchor options, the edges, the wind exposure, what is below the drop, who else is working on the building and how people move around underneath. A generic assessment copied between jobs is worse than none, because it creates the appearance of planning without the substance.
02
Site assessment
Before a method is proposed we look at the roof, not just the elevation. Anchor points, parapet condition, edge profiles, plant and services in the way, access routes for equipment, and the ground area that will need to be controlled. This is why we quote after a site visit rather than from a photograph.
03
Twin-rope systems
Two independent ropes on every descent: a working line carrying the technician through a descender, and a separate backup line with a fall-arrest device. Wherever the structure allows, the two lines go to separate anchors, so that a single anchor is not a single point of failure.
04
Fall protection & backup
The backup device travels on the second rope and locks if the working system fails or if the technician loses control. Transfers at anchors, edges and deviations are made so that the technician is attached by at least two points throughout — there is no moment of being connected by one thing only.
05
PPE
Full-body harness, work-at-height helmet with a retained chin strap, gloves, eye protection where the task requires it, and task-specific protection for chemical cleaning or coating work. PPE is inspected with the rest of the kit, not treated as clothing.
06
Work positioning
Adjustable lanyards and work-positioning kit hold the technician stable at the work face with both hands free. Stability is a safety control as much as a productivity one: a technician braced properly is not fighting the rope while handling tools.
07
Equipment inspection
Pre-use checks before every shift on ropes, harnesses, connectors, descenders, backup devices, slings and anchors, alongside recorded periodic inspections. Anything damaged, contaminated, shock-loaded or simply doubtful is withdrawn from service rather than monitored.
08
Rescue planning
A rescue plan is written for the actual structure before work begins, and the rescue kit stays rigged on site for the whole shift. The plan is for the team to recover a stranded technician themselves — waiting for outside assistance is not a rescue plan.
09
Dropped-object control
Tools are tethered, buckets and bags are closed, and the area under an active drop is excluded with barriers and signage and monitored from the ground. Most of the risk a rope access job creates for other people is dropped objects, not the technicians themselves.
10
Weather limits
Rain, wind and lightning stop rope work. Limits are set before the shift and the team comes off the ropes when they are reached, which is one reason programmes for exterior work in Sri Lanka are planned around the monsoon rather than through it.
11
Chemical & process safety
Cleaning agents, biocides, sealants and coatings are used with the manufacturer’s controls: correct dilution, correct PPE, test patches, containment of runoff and safe storage on site. What goes down a facade ends up on the pavement, the landscaping or in a drain.
12
Emergency preparedness
Emergency arrangements are agreed with the site before work starts: who to contact, where the assembly point is, how the exclusion zone is cleared, and how a casualty would be brought to ground and handed over. Radios keep the technicians, the anchor and the site contact in contact throughout.